Samples Of Our Work

Installation of new bus shelter…
Installation of new bus shelter

New access to new properties
New access to new properties

New footpath to cemetery
New footpath to cemetery

Re-surfacing of Thames water pumping…
Re-surfacing of Thames water pumping station

Resin bound surfacing laid on…
Resin bound surfacing laid on porous asphalt

Surfacing of new driveway, no…
Surfacing of new driveway, no edging kerb required

New driveway with steel edgings…
New driveway with steel edgings

Charlbury surfacing works - Removal…
Removal of very old and worn out asphalt surface, instal Type 1

Charlbury surfacing works - lay…
Lay binder course and Golden Flint shingle to parking area

Charlbury surfacing works - lay…
Lay surface course.

Charlbury surfacing works - surface…
Surface the new parking area with binder course and 10mm s m a.

A new entrance surface in…
Milton under Wychwood - A new entrance surface with 20mm dense binder course & 10mm Stone Mastic Asphalt

Remove old surface, apply tack…
Remove old worn out surface , apply tack coat / regulate low areas and then re-surface with AC 10 close surface course.

Re-surface with AC 10 close…
Remove old worn out surface , apply tack coat / regulate low areas and then re-surface with AC 10 close surface course.

Installation of surface water drainage…
Installation of surface water drainage prior to surfacing driveway

Laying binder course and S…
Laying binder course and S M A to new driveway

Surfacing of new drop kerb
Surfacing of new drop kerb

Plane out damaged surface and…
Plane out damaged / worn out surface at Witney & re-lay with S M A and re mark line works etc

Laying of resin bound surfacing…
Laying of resin bound surfacing in Moreton In Marsh

Laying of resin bound surfacing…
Laying of resin bound surfacing in Moreton In Marsh

Laying of Ultidrive 20
Laying of Ultidrive 20 in Moreton In Marsh

Brick Pave Patio
Remove existing slab patio, excavate lay Type 3, lay permeable brick paviours

Plane out damaged surface and…
Plane out damaged / worn out surface at Witney & re-lay with S M A and re mark line works etc



















